• Project information:

    In 2018, the UK's first high-energy proton beam therapy centre run by the NHS opened in the North West.

  • Our brief:

    Beta Signs were instructed to manufacture and install two halo illuminated signs.

  • We were unable to fix the lettering directly to the cladding as the tiling could not be drilled.

  • Our solution was to attach the lettering to rails, which were in turn attached to the building, with fixings passing through the joints between the tiles.

  • Location:

    Manchester

  • Date completed:

    July 2018