In 2018, the UK's first high-energy proton beam therapy centre run by the NHS opened in the North West.
Beta Signs were instructed to manufacture and install two halo illuminated signs.
We were unable to fix the lettering directly to the cladding as the tiling could not be drilled.
Our solution was to attach the lettering to rails, which were in turn attached to the building, with fixings passing through the joints between the tiles.
Manchester
July 2018